Engineers test, validate, run, and then give over the system to the end user during the commissioning phase. To successfully hand over a system, it needs good communication skills, technical know-how, an awareness of the site's conditions, process expertise, and customer tweaking.
Commissioning Checklists:
In this page, we'll look at some of the fundamental general principles and checklists that are taken into account by Supply & Commissioning Of Industrial Automation Uttarakhand during commissioning.
Ensure sure all of the remote IO devices are correctly installed in their assigned locations. Any missing device or instrument, or its incorrect positioning in the plant layout, will impair the system's functionality because PLC is all about inputs and outputs.
Moreover, verify that all of the cables leading from a device to the panel are appropriately laid out. Megger tests the motors and makes sure the electrical panel and instruments are earthed. It is crucial to verify the wires' continuity. You must make sure that there are no broken wires or other external damages to the electrical component, which is a crucial parameter. One crucial factor to look at is the civil structure (GA drawing) of the components. Each component's construction and positioning must be carefully inspected to prevent accidents.